Our Services

Electronic Drawing Approval System

Electronic drawing approval system of KR can secure submitted custormer drawing and ensure prompt reception and reply.

01

Drawing Approval for Ships.

Electronic drawing approval of vessel’s system is accepted and the results can be checked.

02

Drawing Approval for Equipment.

Electronic drawing approval of equipment is accepted and the results can be checked.

03

Rule Calculator

Machinery & structure Web based calculation sheet in accordance with the KR Rule for steel vessels.

Our Team

Meet Our Plan Approval Team

img

Liquid Cargo Ship Team

Drawing approval and technical review of hull structures, hull equipment and installations for the following ship types. Tanker(Oil, Chemical, LPG, LNG), Passenger Ship, Special Purpose Ship, Fishing Vessel.

img

Dry Cargo Ship Team

Drawing approval and technical review of hull structures, hull equipment and installations for the following ship types.General Cargo Ship, Bulk Carrier, Ore Carrier, Work Vessel, Solid Waste Cargo Ship, Container ship, Ro-Ro Ship, Barge, Tug Boat, Offshore, Floating dock, Dock Gate, Dredger

img

Machinery Team

Approve the vessel’s propulsion system and auxiliary machinery drawings.

img

Electric and Automation Team

Electric & Automation Team is carried out the appraisal and review of plans and documents relating to the electric and automation control system.

img

Environment & Piping Team

Approve drawings of ships' piping system, fire-fighting system and MARPOL related documents.

img

Stability & Tonnage Team

Stability & Tonnage Team is in charge of the plan approval and the technical review for stability, loading lines, EEDI.

img

China Plan Approval Center

China Plan Approval Center is located in Shanghai, in charge of review and approval of design plans of ships constructed or repaired in China area, to verify compliance of hull structure, stability, machinery, piping, electrical and automated systems, etc. to the requirements of KR Rules and Guidance, international conventions and the various governments concerned.

img

Survey Team

Survey team is in charge of procedure for TOC(Transfer of Class) and CSA (Registration after construction from non-IACS)
Drawing approval and technical review during TOC or CSA survey

Our Sites

KR Digital Service